(posted Jun 07, 2024)
FOR IMMEDIATE RELEASE
DATE: FRIDAY, JUNE 7, 2024
Sign up for RCKC CONNECT to receive message alerts for road construction, road closures/detours, and general public news from the Road Commission of Kalamazoo County website at: www.kalamazoocountyroads.com
Kalamazoo, MI-
In an effort to keep local drivers informed of the latest traffic and road maintenance operations by the Road Commission, we have provided the following update for the week of June 10, 2024. For further information call 269-381-3171 or visit RCKC website www.kalamazoocountyroads.com.
“This information is made available to assist motorists in planning for construction delays,” Joanna Johnson, Managing Director of the Road Commission said. “Motorists are reminded to be alert, slow down, stay informed, and be cautious when approaching a work zone. Remember, these projects signify progress in improving our infrastructure!”
Please note: This information is subject to change. Projects, road closures and timing can change from day to day, depending upon a number of factors, and traffic delays can develop in a matter of minutes due to weather conditions, emergency situations, etc.
Alamo Township
Road: D Avenue - 6th Street to Ravine Road
Current Status: Tree removal and trimming complete. Road work to begin 8/12.
Detour: None
Project Information: This project includes tree removal and trimming, drainage improvements, asphalt paving, and restoration.
Start Date: April 8, 2024
End Date: September 30, 2024
******************************************************************
Charleston Township
Road: Mercury Drive - MN Avenue to East Michigan Avenue
Current Status: Removals continuing the week of 6/10. At this time, MN Avenue will be
closed from 44th Street to Mercury Drive.
Detour: MN Avenue and Mercury Drive will be closed to through traffic during the project. The detour route is East Michigan Avenue and 40th Street.
Project Information: This project includes asphalt milling and resurfacing and some curb and gutter installation.
Start Date: May 28, 2024
End Date: August 2, 2024
Road: MN Avenue - 44th Street to Mercury Drive
Current Status: Removals continuing the week of 6/10. At this time, MN Avenue will be closed from 44th Street to Mercury Drive.
Detour: MN Avenue and Mercury Drive will be closed to through traffic during the project. The detour route is East Michigan Avenue and 40th Street.
Project Information: This project includes widening for a turn lane at 44th Street, milling and paving, and realignment of the intersection of MN Avenue at Mercury Drive.
Start Date: May 28, 2024
End Date: August 2, 2024
******************************************************************
Climax Township
Road: 40th Street - R Avenue to Q Avenue
Current Status: Paving Top Course on 6/7 and shoulder Gravel the week of 6/10.
Detour: None
Project Information: New reconstruct, shoulder and drainage improvements, tree removal, hot mix asphalt (HMA) surface.
Start Date: April 8, 2024
End Date: August 30, 2024
******************************************************************
Comstock Township
Road: ML Avenue - Sprinkle Road to 26th Street
Current Status: Milling, Paving and Drainage improvements will begin the week of 6/10
Detour: None
Project Information: This project includes asphalt milling, asphalt paving, drainage
improvements, curb & gutter replacement, and restoration.
Start Date: May 28, 2024
End Date: July 31, 2024
******************************************************************
Kalamazoo Township
Road: Alecia Avenue - Christine Street to Westnedge Avenue, Christing Street - Alecia Avenue to Beth Avenue, Beth Avenue - Chloe Street to Christine Stret, Chloe Street - 127' west of Beth Avenue to Beth Avenue
Current Status: Structures will be raised on 6/7 and restoration week of 6/10 and that
will complete project
Detour: Traffic will be maintained for this project using traffic regulators.
Project Information: This project includes lowering structures, milling and HMA paving.
Start Date: May 13, 2024
End Date: July 31, 2024
Road: Davis-Omstead Drain - Olmstead Road to Olmstead Road
Current Status: Project will resume in 7/8.
Detour: Brookfield Avenue and Springfield Avenue will be closed at alternate times during the project. The detour route is around the block on either Greenfield Avenue or Market Street.
Project Information: This project includes culvert replacement at two road crossings in addition to stream bank restoration.
Start Date: April 1, 2024
End Date: October 25, 2024
Road: Squires Drive - Drake Road to Ravine Road
Current Status: Removals at the intersection of Squires Dr at Drake Rd beginning 6/10.
The intersection will be closed and a detour route will be posted.
Detour: Squires Drive will be closed to through traffic during the project. The detour route is Ravine Road to Drake Road.
Project Information: This project includes construction of a roundabout at the intersection of Drake Road at Squires Drive. Squires Drive will also be reconstructed with shoulder widening and drainage improvements.
Start Date: March 1, 2024
End Date: August 9, 2024
Road: Douglas Avenue - City of Kalamazoo Limits to Barney Road/Mosel Avenue
Current Status: For week of 06/10 removals from US131 BL to Mosel Ave will occur.
The road will be closed between Mosel Ave and US131 BL.
Project Information: This project includes milling and resurfacing, storm sewer improvements, and curb and gutter replacement.
Start Date: April 26, 2024
End Date: August 30, 2024
******************************************************************
Oshtemo Township
Road: Baton Rouge Street – Belle Chase Boulevard to 8th Street, Charles Street – 600’ west of Belle Chase Boulevard to 8th Street, Cajun Drive – 175’ west of Belle Chase Boulevard to Belle Chase Boulevard, Belle Chase Boulevard – 206’ south of Saint Charles Street to Baton Rouge Street, Bayou Vista Street – Saint Charles Street to Baton Rouge Street
Current Status: Structure adjustments and milling will begin the week of 6-10
Detour: None
Project Information: Milling and Paving new surface with drainage adjustments and improvements
Start Date: June 10, 2024
End Date: August 30, 2024
Road: 9th Street - Stadium Drive to KL Avenue
Current Status: Tree removal and clearing complete. Road work to begin 6/17.
Detour: None
Project Information: This project includes asphalt milling, asphalt paving, manhole adjustments, tree trimming, and restoratiion.
Start Date: April 15, 2024
End Date: August 10, 2024
Road: Stadium Drive - 8th Street to 9th Street
Current Status: Tree removal and clearing complete. Road work to begin 6/17.
Project Information: This project includes asphalt milling, asphalt paving, manhole adjustments, tree trimming, and restoration.
Start Date: April 15, 2024
End Date: August 10, 2024
******************************************************************
Richland Township
Road: Greer Drive - 35th Street to 4,600' east of 35th Street
Current Status: Tree work complete, drainage improvements to follow.
Detour: None
Project Information: HMA Overlay
Start Date: May 13, 2024
End Date: July 1, 2024
******************************************************************
Schoolcraft Township
Road: North Barton Lake Drive - Barton Drive to 702' north of Clyde Street
Current Status: Awaiting Fog Seal
Detour: None
Project Information: HMA cold milling and paving, structure adjustments, and roadside restoration.
Start Date: May 1, 2024
End Date: June 20, 2024
Road: Sweet William Drive - 14th Street to Crocus Street, Crocus Stret - 261' south of Sweet William Drive to Jasmine Avenue
Current Status: Awaiting Fog Seal
Detour: None
Project Information: HMA cold milling and paving, structure adjustments, and roadside restoration.
Start Date: May 1, 2024
End Date: June 20, 2024
******************************************************************
Texas Township
Road: Barony Pointe – Parkstone Terrace to Q Avenue, Wyndwood Pointe – 541’ west of Barony Pointe to Barony Pointe, Thornwood Pointe – 351’ west of Barony Pointe to Barony Pointe, Grapevine Circle – Parkstone Terrace to Parkstone Terrace, Parkstone Terrace - Barony Pointe to Bainridge Drive, Tawney Pointe – 347’ south of Parkstone Terrace to Parkstone Terrace, Bainridge Drive – Barony Pointe to 6th Street, Brandon Circle – Bainridge Drive to Barony Pointe
Current Status: Awaiting Fog Seal
Detour: None
Project Information: HMA Cold Milling and paving, structure Adjustments, Shoulder gravel, and roadside restoration.
Start Date: April 26, 2024
End Date: June 1, 2024
Road: Beatrice Drive - 9th Street to 610' east of 9th Street
Current Status: Manhole adjustments week of 6/3.
Detour: None
Project Information: HMA Cold Milling and paving, structure Adjustments, Shoulder gravel, and roadside restoration.
Start Date: April 26, 2024
End Date: June 1, 2024
******************************************************************
Wakeshma Township
Road: U Avenue - 42nd Street to 44th Street
Current Status: Pulverize week of 6/3
Project Information: Gravel, Pulverize, and Double Chip Seal
Start Date: May 13, 2024
End Date: July 31, 2024
Road: 44th Street - W Avenue to V Avenue
Current Status: Pulverize week of 06/10
Detour: none
Project Information: Gravel, Pulverize, and Double Chip Seal
Start Date: June 10, 2024
End Date: July 31, 2024
Road: W Avenue - 42nd Street to 44th Street
Current Status: Week of 6/10 shoulder work to occur. Road will remain closed.
Detour: W Avenue will be closed and detoured to traffic. The detour route is 42nd Street, R Avenue, 1/2 Mile Road, K Drive S, 2 Mile Road, O Drive S, and 1 1/2 Mile Road.
Project Information: This project includes roadway crushing, shaping, resurfacing, shoulder widening, and drainage improvements.
Start Date: April 1, 2024
End Date: August 2, 2024
******************************************************************
County Wide Projects
Road: Crack Filling on various roads in Kalamazoo County
Current Status: Crack Fill will continue the week of 6/3 starting in Comstock Township and progressing counterclockwise throughout the county.
Detour: None
Project Information: Traffic to be maintained during project. This is a mobile operation, temporary traffic regulators may be necessary and slight delays are possible.
Start Date: April 22, 2024
End Date: November 30, 2024
Road: Hot Mix Asphalt Wedging on various roads in Kalamazoo County
Current Status: Wedging will continue the week of 6/3, will continue to work on south half.
Detour: Traffic to be maintained during the project. Temporary traffic regulators may be necessary.
Project Information: Placing short stretches of asphalt pavement to bridge small areas of excessive cracking or to correct road slope
Start Date: April 15, 2024
End Date: June 30, 2024
###